Although the site hasn't been updated for a while, the work on the car has progressed at a steady pace throughout December and January. A summary: - The firewall has been completed.
- Engine wiring has been sorted out and connected
- All engine tubing has been done, except for the cooling
- Front steering rack sides have been sealed off with aluminium plates.
- Brake, clutch and vacuum lines installed to the front of the car.
Bought a lot of items for the car: - stainless steel tubing for the cooling systems
- a pair of brandnew Vitaloni mirrors
- a pair of Carello fog lights for the front spoiler.
- silicone tubing for vacuum and cooling
- loads of Rover parts to complete the engine.
- sound deadening material for the firewall.
The gallery has been updated, here are some thumbs already: 
   
|